2020 Prefabrication Project of Accropode Blocks for Artificial Island and Main Line Weir Construction Section of Shenzhen–Zhongshan Bridge

Project NamePrefabrication Project of Accropode Blocks for Artificial Island and Main Line Weir Construction Section of Shenzhen–Zhongshan Bridge
Project LocationGuangdong, ChinaEngineering Costs3.3 million yuan
Start timeApril, 2020Completion timeJanuary, 2021
CompanyName
Owner

Shenzhen–Zhongshan Bridge Management Center

DesignChina Ocean Survey and Design Institute and China Railway Port and Navigation Bureau Design Institute Consortium
SupervisoryChina Railway Bridge Supervision, Guangzhou Port Engineering Management and Shanghai Haike Consortium
Project Overview

Prefabrication and installation of over 20,000 concrete accropodes of two specifications, 3T and 5T, with a total volume of approximately 26,000 cubic meters and a concrete grade of C35. We are responsible for on-site prefabrication. Shipping and installation are the responsibility of the construction general contractor. The total construction period lasts for 8 months.

预制场区进场大门.jpg预制工人休息间.jpg混凝土搅拌站.jpg

扭王字块体预制(1).jpg 扭王字块体预制.jpg

扭王字块体预制堆放航拍照片.jpg扭王字块体预制堆放航拍照片(1).jpg扭王字块体堆放区.jpg

Contact Us

Ningbo Xiaolang Construction Engineering Co., Ltd.
Ningbo Tianyuan Cement Products Co., Ltd.