Home >> Projects

2021 Port Accropodes Prefabrication Project of Shandong Rongcheng Xinhong Phase IV

Project NamePort Accropodes Prefabrication Project of Shandong Rongcheng Xinhong Phase IV
Project LocationShandong, ChinaEngineering Costs4.05 million yuan
Start timeSeptember, 2021Completion timeSeptember, 2022
CompanyName
OwnerCUD(WEIHAI)SHIPYARD CO.,LTD.
DesignTianjin Harbor Design and Research Institute
SupervisoryGuangdong Technology Venture Capital Co., Ltd.
Project Overview

This project is constructed according to the accropode drawings provided by the owner; The prefabrication site, C30F250 concrete, and transportation in the construction are all provided by the owner. A total of 10000 pieces of 10T accropodes and 1500 pieces of 14T accropodes are prefabricated, with a total construction period of 204 days. A total of 83 sets of 10T and 23 sets of 14T of steel molds are invested.

扭王字块预制现场.jpg扭王字块预制现场(1).jpg扭王字块现场安装.jpg扭王字块现场安装(1).jpg20230209153353335333.jpg



Contact Us

Ningbo Xiaolang Construction Engineering Co., Ltd.
Ningbo Tianyuan Cement Products Co., Ltd.