2014 Jintang Port Area Taipukou Container Terminal Project Stage II Embankment and Land Formation Works

Project NameJintang Port Area Taipukou Container Terminal Project Stage II Embankment and Land Formation Works
Project LocationZhoushan, ChinaEngineering CostsAbout 55 million yuan
Start timeJune, 2014Completion timeDecember, 2016
CompanyName
OwnerZhoushan Yongzhou Container Terminal Co., Ltd
DesignCCCC Shanghai Waterway Survey and Design Institute
SupervisoryNingbo Port Engineering Project Management Co., Ltd
Project Overview

The new embankment is 1,158 m in length, with a riprap structure, 2T accropodes revetment, and a reinforced concrete wave breakwater protecting surface of the top of the embankment with slurry masonry blocks wrapped around it, with a sand-filled pipe bag anti-filtration layer inside. The dike is filled with 1.8 million m³ of blown sand, forming a land area of 261,000 ㎡.

工程总平面效果图.jpg开工庆典仪式.jpg海上铺排船作业.jpg海上插板船施工.jpg海上船插与潮间带插板、海上铺排同步施工.jpg围堤堤身汽运抛石.jpg2吨扭王字块预制场预制.jpg扭王字块安装.jpg竣工的防浪墙.jpg新建围堤段全貌(一).jpg新建围堤段全貌(二).jpg